Description of the property
| General Information about IBV Horné Lúky Project |
| Location |
IBV Horné Lúky, Lúčnica nad Žitavou (Martinová), 5 km from Vráble |
| Construction Start |
August 2025 |
| Construction Completion |
Summer 2026 |
| Property Type |
Family houses (shell and core with turnkey option) |
| Building Permit |
Valid building permit issued |
| Utilities |
Water supply, sewage, electricity connection, optical internet, street lighting, sidewalk |
| Access Road |
Private, two-way, 5.5 m wide |
| Sidewalk |
1.5 m wide |
| Fencing |
Concrete fencing |
| Materials and Brands Used |
Heluz, Wienerberger Slovaktual/Fenestra, Panasonic, Wiesmann (TČ) |
| Contractual Partners |
Stavmat, Dek, Stavivo Nové Sady |
| Included Services |
Complete legal service, reservation agreement, future contract agreement, purchase agreement, geometric plan |
| VARIANT No.1 (Shell and Core) |
| Type |
Shell and Core |
| Number of Rooms |
3 (1x bathroom, 1x WC) + wardrobe |
| Built-up Area of House |
125 m² |
| Usable Area |
85 m² + 12 m² terrace |
| Plot Size |
approx. 450 m² |
| Included |
Fencing |
| VARIANT No.2 (Shell and Core) |
| Type |
Shell and Core |
| Number of Rooms |
4 (1x bathroom, 2x WC) + wardrobe |
| Built-up Area of House |
160 m² |
| Usable Area |
105 m² + 32 m² terrace |
| Plot Size |
approx. 900 m² |
| Included |
Heat pump, fencing |
| VARIANT No.3 (Turnkey Terraced House) |
| Type |
Turnkey Terraced House |
| Number of Rooms |
4 (1x bathroom, 2x WC), wardrobe |
| Built-up Area of House |
119 m² |
| Usable Area |
106 m² with terrace |
| Plot Size |
300 m² |
| Included |
Heat pump, 2x parking spaces, fencing, tiles, paving, doors, switches, sockets (excluding kitchen, appliances, built-in wardrobes) |
IBV Horné Lúky is a new development where construction began in AUGUST 2025 in the municipality of Lúčnica nad Žitavou (Martinová), 5 km from the city of Vráble. It offers the construction of family houses in the "holodom" (shell and core) stage with the option of "turnkey" completion. A valid building permit has been issued. The houses will be connected to all utilities: water supply, sewage, electricity connection, optical internet, street lighting, and a sidewalk. The location has its own private two-way access road 5.5 m wide and a sidewalk 1.5 m wide with concrete fencing. Construction is planned to be completed by summer 2026. Only the highest quality materials and brands such as Heluz, Wienerberger Slovaktual/Fenestra, Panasonic, Wiesmann (TČ) are used in construction. Contractual partners include building material suppliers Stavmat, Dek, Stavivo Nové Sady. Complete legal services and the provision of all documentation (reservation agreement, future contract agreement, purchase agreement, geometric plan) are included.
⚠️
In some cases, the information is collected from open sources. All rights to the photographs and materials belong to the developers and authors. We respect copyright. If you are a rights holder, we are ready to remove or amend the information at your request.